Dokuz Eylül 1991 | İZSU 1993 - 2026

Burhan DURMUŞ

Senior Civil Engineer | İZSU Genel Müdürlüğü

Burhan Durmuş graduated from Dokuz Eylül University in 1991 and has served within the İZSU General Directorate since 1993. He is a senior civil engineer with more than 33 years of experience in public procurement legislation, large-scale infrastructure investments, field supervision, and contract management.

01Data
33+ yıl
Experience
Public infrastructure leadership since 1993
02Data
1991
Graduation
Dokuz Eylül University
03Data
720.776 m
Annual record
2017 drinking water line construction
04Data
4735 / Altyapı
Specialty
Procurement law and large-scale infrastructure investments
Role area1
Pre-tender preparation, cost estimation, quantity takeoff, and technical specifications
Role area2
Contract administration, progress payment control, and field supervision
Role area3
Technical review and expropriation support for institution-owned facilities
Portrait photograph of Burhan Durmuş

User-provided portrait

Burhan DURMUŞ

Mobile facility view
Mobile facility view

İZSU Genel Müdürlüğü

Profile Summary

Burhan Durmuş graduated from Dokuz Eylül University in 1991 and has served within the İZSU General Directorate since 1993. He is a senior civil engineer with more than 33 years of experience in public procurement legislation, large-scale infrastructure investments, field supervision, and contract management.

Core details

Burhan DURMUŞ

Graduation and career-start milestones establish the core timeline of the public-infrastructure career.

33+

Graduation

1991

Career start

1993

Current role focus

Current responsibility areas

Active responsibilities across tendering, field supervision, and technical review.

1

Pre-tender preparation, cost estimation, quantity takeoff, and technical specifications

2

Contract administration, progress payment control, and field supervision

3

Technical review and expropriation support for institution-owned facilities

1991 - 2026

Chronological Career Path

A chronological career summary spanning early private-sector experience, control engineering at IZSU, branch leadership, and current contract-management responsibilities.
1991 - 1993
Step 1

Early sector experience and technical consultancy

After graduation, he began his career by providing technical consultancy in design offices and construction sites. He served as technical consultant for a 50-unit housing cooperative in the Şemikler district of İzmir.

özel sektörşantiyedanışmanlık
1993 - 2000
Step 2

Joining İZSU and the Grand Canal era

After joining the İZSU General Directorate, he served as a control engineer on major infrastructure works including the Bornova Industrial Wastewater Collector, the 2400 mm diameter steel pressure pipeline between Çiğli Wastewater Treatment Plant and Çiğli Pump Station, the N4200 main interceptor canal, and the Karşıyaka and Çiğli Wastewater Pump Stations.

Büyük Kanalkontrol mühendisiatıksu
2000 - 2006
Step 3

Creek rehabilitation and drinking water projects

He specialized in the rehabilitation of the Bornova Homeros Valley, Poligon, and AOSB creeks, including the construction of check dams. From 2003 onward, he was authorized to act as controller for drinking water network projects, strengthening his expertise in water management.

dere ıslahıiçmesuyukontrolörlük
2006 - 2009
Step 4

Facilities Construction Branch and the arsenic response

As Facilities Construction Branch Manager, he completed the Urla İYTE, Seferihisar, and Bayındır wastewater treatment plant projects. During the 2008 drought and water crisis in İzmir, he contributed to bringing healthy water back to the city by completing the Çullu, Menemen, and Halkapınar Arsenic Treatment Plants in record time.

şube müdürüarsenikarıtma
2009 - 2010
Step 5

Gediz Technical Branch and operations management

Within the Water Facilities Department, he managed operational activities and led personnel- and energy-saving practices during the in-house installation of 21 km of drinking water line.

işletmeenerji verimliliği21 km
2011 - 2019
Step 6

Water Construction Branch and production records

During nine uninterrupted years as Branch Manager, he helped deliver one of the highest performance levels in the institution's history, including 720,776 meters of annual drinking water line construction in 2017, contributing to the reduction of water losses and leakage.

imalat rekoruşube müdürükayıp-kaçak
2020 - 2026
Step 7

Current role: Buildings and facilities maintenance

Within the Machinery Supply and Facilities Department, he continues to lead pre-tender preparation, cost estimation, contract management, and field supervision while supporting technical review and expropriation processes for institution-owned facilities.

bakım onarımsözleşme yönetimikamulaştırma

Public Context

Project and Responsibility Areas

These responsibility areas are grouped around procurement, field delivery, wastewater conveyance systems, water structures, and current facility processes.
01
Facility delivery2006 - 2009

Arsenic treatment and facility investments

Completion of the Urla İYTE, Seferihisar, and Bayındır facilities together with arsenic treatment investments delivered in record time during the 2008 water crisis.

Metric

2008

Period

Metric

3+

Plants

Metric

Şube Müdürü

Role

Project note

The rapid delivery of the Çullu, Menemen, and Halkapınar arsenic treatment facilities as a response for healthy water access reflects strong management and field coordination.

Impact
Key outcome

Healthy water supply and rapid capital delivery during a crisis period.

02
Water management2000 - 2006

Creek rehabilitation and drinking water lines

Integrated expertise in creek channel regulation, check dams, network renewal, and drinking water project control.

Metric

2003

Authority

Metric

Dere + şebeke

Scope

Metric

Kontrolörlük

Approach

Project note

Experience developed across the Bornova Homeros Valley, Poligon and AOSB creeks, together with drinking water networks, brings design, execution, and field supervision together.

Impact
Key outcome

Reduced flood risk, controlled water losses, and longer-lasting networks.

03
Public procurement framework1993 - 2026

Tender and contract management

Managerial expertise shaped by Law No. 4735 on Public Procurement Contracts, progress payment operations, and technical specification drafting.

Metric

4735

Law

Metric

Hakediş

Focus

Metric

Saha + dosya

Delivery

Project note

He adopts a measurable contract management approach built on technical compliance, documentation integrity, and delivery control from pre-tender preparation to field supervision.

Impact
Key outcome

Balanced decision-making between public value, legal compliance, and process reliability.

04
Infrastructure engineering1993 - 2000

Wastewater collectors and pump stations

Field and control-engineering experience across the Grand Canal system, steel pressure pipelines, and pump stations.

Metric

2400 mm

Diameter

Metric

N4200

System

Metric

Kontrol mühendisi

Role

Project note

The management discipline built on the Bornova Industrial Wastewater Collector, the Çiğli treatment line, and critical pump stations prioritizes continuity and operating reliability.

Impact
Key outcome

Wastewater conveyance safety, field coordination, and operational continuity for critical infrastructure.

05
Buildings and facilities maintenance2020 - 2026

Current role and technical review processes

Current responsibilities spanning pre-tender preparation, cost estimation, contract management, field supervision, and expropriation support.

Metric

Yaklaşık maliyet

Focus

Metric

Sözleşme

Process

Metric

Kamulaştırma

Support

Project note

This role within the Machinery Supply and Facilities Department directly links technical dossier quality with field practicality.

Impact
Key outcome

Stronger technical decision quality and sustainable maintenance of institutional facilities.

06
High-volume delivery2011 - 2019

Branch leadership and production records

Institutional performance highlighted by 720,776 meters of annual drinking water line construction during the Water Construction Branch period.

Metric

720.776 m

Record

Metric

9 yıl

Duration

Metric

Kayıp-kaçak

Goal

Project note

Nine years of uninterrupted management responsibility aligned construction speed, field coordination, and non-revenue water reduction around a single target.

Impact
Key outcome

Measurable institutional performance and continuous network improvement.

720.776 m

Achievements and Impact

Long public service, rapid facility delivery during crisis periods, and high-volume institutional output stand out as key outcomes.
Highlight

2008

Rapid facility delivery during crisis

Managerial contribution to completing arsenic treatment facilities in record time during the drought and water crisis.

Highlight

720.776 m

Institutional construction performance

Delivery of one of the institution's highest annual performance levels with drinking water line construction in 2017.

Highlight

33+ yıl

Sustained experience in public infrastructure

A continuous chain of technical responsibility extending from the field to management since 1993.

Highlighted length

720.776 m

2017 drinking water line construction

AMP / ORACLE / CABS

Expertise

These competencies span procurement management, infrastructure delivery, digital tracking systems, and transparent reporting discipline.

Management

Tender and contract management

97%

Strong expertise across Law No. 4735, technical specifications, progress payments, and implementation dossiers.

Capability levelCore

Infrastructure

Infrastructure engineering

96%

Management of drinking water transmission lines, wastewater collectors, pressure lines, and pump stations.

Capability levelCore

Delivery

Field supervision and quality control

95%

Construction follow-up, contractor coordination, reporting, and measurable delivery discipline.

Capability levelCore

Leadership

Transparent reporting and collaborative judgment

92%

A communication style that supports management decisions through field data and shared evaluation.

Capability levelAdvanced

Hydraulics

Creek rehabilitation and water management

91%

Flood control, creek bed regulation, check dams, and network continuity.

Capability levelAdvanced

Systems

Digital integration

88%

Process tracking with AMP, the ORACLE Project Tracking System, and Geographic Infrastructure Information Systems (CABS).

Capability levelAdvanced

2006 / 2015 / 2025

Achievements and Certifications

Recognition, leadership, quality management, and contract-progress payment training complement field experience with managerial and regulatory capability.
2025 AMP Academy legislation update training certificate
AMP Akademi2025

Construction tender legislation update training

Training certificate issued by AMP Academy for the program focused on the construction tender legislation update that came into force on September 1, 2025.

AMP legislation training, 2025

2022 IZSU certificate for construction contracts and progress payment applications training
İZSU Genel Müdürlüğü2022

Construction contracts and progress payment applications training

Participation certificate for the construction contracts and progress payment applications training organized by the IZSU Human Resources and Training Department.

Contracts and progress payment training, 2022

2020 TMMOB advanced-level certificate for construction contracts and progress payments
TMMOB İnşaat Mühendisleri Odası İzmir Şubesi2020

Construction contracts and progress payment applications - advanced level

Advanced-level participation certificate issued by the İzmir Branch of the Chamber of Civil Engineers.

Advanced contracts and progress payments, 2020

2019 IZSU training certificate for construction contracts and progress payments
İZSU Genel Müdürlüğü2019

Construction contracts and progress payment applications

Certificate for participation in the in-service training session delivered by former Court of Accounts expert auditor Yaşar Gök.

Contracts and progress payment applications, 2019

Certificate for the ISO 10002:2014 customer satisfaction management system seminar
LRQA Training2017

ISO 10002:2014 customer satisfaction management system awareness seminar

Certificate of participation in the ISO 10002:2014 customer satisfaction management system awareness seminar delivered by LRQA.

ISO 10002 awareness seminar, 2017

2015 participation certificate for leadership and management training
BKM / İZSU2015

Leadership and management training

Participation certificate for the leadership and management training organized by BKM for IZSU personnel.

Leadership and management training, 2015

2006 İzmir Metropolitan Municipality certificate of appreciation
İzmir Büyükşehir Belediyesi2006

Certificate of Appreciation

Certificate of appreciation presented by İzmir Metropolitan Municipality Mayor Aziz Kocaoğlu.

Certificate of appreciation, 2006

Kamu yararı / Şeffaflık / Erken çözüm

Working Principle

Burhan Durmuş's working style is shaped around solving issues before they grow, reporting transparently, and producing decisions through shared judgment.
Principle 1

Supervision that protects public value is inseparable from good governance.

An understanding of experience and responsibility that contributed to successful audit outcomes.
Principle 2

Solve problems before they grow into knots.

A managerial reflex that detects field issues early and brings them into the decision process on time.
Principle 3

Transparent reporting and shared judgment are the basis of technical trust.

A working style that aligns technical data, team coordination, and institutional responsibility.

657 sayılı Kanun / Kişisel yayın

Legal Notice and Disclaimer

The following notice clearly states the scope of the site, its non-commercial nature, and the limits of institutional representation.
Item 1

Personal Publication

This website is a digital resume created solely for personal and academic sharing purposes, without any commercial intent, within the framework of the Turkish Civil Servants Law No. 657.

Item 2

No Commercial Activity

No consultancy service is offered through the site, no advertising revenue is generated, and no commercial proposal is presented.

Item 3

Institutional Representation

The information presented here reflects personal professional experience rather than official institutional opinions. Technical content is prepared in light of publicly accessible data and individual experience.

Item 4

Communication

No direct messaging channel or contact form is provided on this website. Official institutional channels must be used for requests related to formal public procedures.

Burhan DURMUŞ

Senior Civil Engineer | İZSU Genel Müdürlüğü

This site is published as a non-commercial personal digital resume.

Public Context

The technical context used in the text is based on the professional profile supplied by the user together with publicly accessible infrastructure and legislative context.